Flooring Estimator
Tile count (with cutting wastage) plus the bedding mortar for tile or stone flooring.
Tiles (incl. wastage)
306
Cement (50 kg bags)
19.15
Sand (CFT)
93.94
Tiles per m²
2.78
Cement (kg)
957.6
Sand (m³)
2.66
Assumptions: tile wastage percent 10 · bed thickness mm 25 · mortar ratio 1:4