Excavation & Foundation
Pit excavation volume, loose soil for cart-away with truck trips, plus the PCC levelling course materials.
Excavation (m³)
100
Cart-away truck trips
28
Loose soil (m³)
125
PCC cement (bags)
33.26
PCC sand (CFT)
81.58
PCC aggregate (CFT)
163.15
PCC water (litres)
792
Assumptions: bulking factor 1.25 · truck capacity m3 4.5